« Fireplace Freshen 5 | Main | It's a dry heat. Tales of the Anti-Destination League. »

May 15, 2008

Guest Bath 5

The Guest Bath is painted and ready for tile, fixtures and trim.
The shower area is not primed or painted by direction of the tiler. The tiles are 6x6'' in Kohler white which will go from tub to ceiling. The window opening is a little less than 6'' so that at the most the tiles will only need a light trim.
Shower7
The towel shelf is complete, but the plastic is staying until the tile work is finished.
Towelshelf7

The door was sticking originally. Once I installed shims (there weren't any) and re squared the opening, the door didn't stick. I had to replace the entire trim set as the original molding was no longer available.
Doorway


Comments

Post a comment

If you have a TypeKey or TypePad account, please Sign In

Things

  • note
  • Video Wish List
  • where desire exceeds income
    My Amazon.com Wish List
  • search

Drywall Patch

  • Second Coat
    This is a guide to patch holes that appear in drywall yourself.

Smoothwall

  • Smoothwall32
    This is a tutorial on refinishing walls. Specifically it is about making walls smooth, which is a result of moving into a house that has 'textured' walls.

Taping

  • Painting
    This is a short tutorial on Taping Drywall for the folks who want to tackle remodeling projects that involve drywall.